Regulatory Standard No. 35 (NR-35), which governs Work at Height in Brazil, has gone through two relevant updates issued by the Ministry of Labor and Employment (MTE).

Anyone managing industrial operations with activities above two meters needs to update internal procedures and audit their equipment fleet to stay legally compliant.

What Changed in NR-35?

Two ordinances changed practical requirements: a fall-arrest lanyard must now be integrated with an energy absorber, and NR-35 training must now be delivered in person. Here is each change, with the ordinance and the deadline:

Topic What Now Applies Ordinance and Deadline
Fall-arrest lanyard If the connecting element used for fall arrest is a lanyard, it must be integrated with an energy absorber that cannot be removed without damaging it (item 35.6.9.1.1 and glossary) MTE Ordinance 1,680/2025 (Official Gazette of 10/03/2025), in force 90 days after publication: 01/01/2026
Marking of portable ladders for individual use Minimum marking with manufacturer (company name and CNPJ tax ID), month and year of manufacture or serial number, weight, maximum load, among other data (item 5.2.2.4 of Annex III) MTE Ordinance 1,680/2025, art. 3: applies one year after the ordinance took effect, from 01/01/2027
Fixed vertical ladders used only as a means of access A specific risk analysis decides whether a personal fall protection system (SPIQ) is needed, considering purpose, frequency of use, and ladder characteristics (sub-item 5.2.1.1.1 of Annex III) MTE Ordinance 1,259/2026, art. 7: 1 to 3 years depending on the total number of ladders per unit, sector, or activity (up to 500; 501 to 1,000; over 1,000)
Training Training required by NR-35 must be delivered in person (item 35.4.5) MTE Ordinance 1,259/2026 (Official Gazette of 07/16/2026), art. 8: 1 year to redo or complete in person any initial training partly delivered remotely
Work Permit Still mandatory for non-routine activities (item 35.5.7) No change

What Did Not Change in the Standard

The core definition remains the same: work at height is any activity performed more than 2.00 m above the lower level where there is a risk of falling.

A Risk Analysis (AR) before all work at height (item 35.5.5), a Work Permit (PT) for non-routine activities (item 35.5.7), and an operating procedure for routine activities (item 35.3.1) all remain mandatory.

The 2 Changes That Weigh Most on an EHS Manager's Day-to-Day

Lanyard Integrated with an Energy Absorber

Since January 1, 2026, when MTE Ordinance No. 1,680/2025 took effect, a lanyard used for fall arrest must be integrated with an energy absorber. Under the NR-35 glossary, this means an absorber that cannot be removed from the lanyard without damaging it; a loose absorber attached to a standard lanyard no longer meets item 35.6.9.1.1.

In-Person Training

MTE Ordinance No. 1,259/2026 added item 35.4.5: training required by NR-35 must be delivered in person. Article 8 of the ordinance grants 1 year, counted from its publication on 07/16/2026, for organizations to redo the initial training in person or complete the course hours when part of it was already in person.

Ladders: Two Different Deadlines, Don't Mix Them Up

Marking of portable ladders for individual use applies from 01/01/2027. The specific risk analysis for fixed vertical ladders used only as a means of access has a staggered deadline of 1 to 3 years, depending on the number of fixed ladders in each unit, sector, or activity. Two ordinances, two separate timelines.

How Anchor Solves This